+7 / 7187 / 278-543

About

Dynamically developing company «KBI Energy Group» LLP represents a large specialized design and installation organization with a highly developed industrial base, qualified personnel and engineering staff, able to perform design, installation and commissioning work of any complexity in a very short time at a high technical level.

The company’s goal is achieve high performance in sphere of the construction of new and modernization of existing power facilities on the territory of the Republic of Kazakhstan.

In 2013, after the completion of build national ratings companies of the Republic of Kazakhstan, according to the results of 2011-2012 the company entered TOP-100 BEST ENTERPRISES of the YEAR «THE LEADER OF KAZAKHSTAN 2013»

By results of statistical ranging of economic indicators for 2013-2014, conducted by the National business rating of Kazakhstan, the company took 1st place among the enterprises of the Republic of Kazakhstan on the amount of places of four taxes and 1st place for the criterion of «VAT»

In 2014 according to the economic and financial indicators the company took the 1st place ranking among importers of the Republic of Kazakhstan on the sum of places of 4 foreign economic activities indicators: «Export/import volume», «Growth in comparison with previous periods», «Diversification as the number of commodity positions», «Geography as the number of counterparties» according to commodity group 850423 – electric machines and transformers with electric power more than 10000 kW.

Once again confirming their high achievement on the results of financial-economic ranking, the company entered TOP-5 BEST ENTERPRISES of the YEAR «THE LEADER OF KAZAKHSTAN 2015», and took 3rd place among the enterprises of the Republic of Kazakhstan (Repair and maintenance of electric motors, generators and transformers). This award was the result of effective management strategies and well-coordinated work of the whole team by the end of 2015-2016.

The company took the 1st place of the National Business Rating of Kazakhstan by the sum of the four categories of financial  and economic activities and is a recognized INDUSTRY LEADER 2015.

In 2016, the company was awarded a national tax award 2016 of the Fund of support entrepreneurial initiatives. The Fund awarded the title «Conscientious taxpayer», also in 2016 in the framework of the “Social unity” the company became the laureate of the international prize «Business Triumph».

2017 was not less successful:

  • Within the framework of the international program” Euro-Asian partnership “KBI Energy Group LLP became the winner of the” Unity and Success “award with the honorary title” Reliable business Partner”.
  • For success in the field of labor protection, the absence of violations of labor law and prevention of accidents during production, the chief state labor inspector of Pavlodar region on November 14, 2017, our company was issued a “certificate of trust” on compliance of the employer’s activities with the requirements of labor law of the Republic of Kazakhstan on observance of labor rights of workers
  • At the annual ceremony of awarding the winners of the program” national greatness “in the state Kremlin Palace, We were awarded the international award”Business standard”.
  • On December 19, 2017, our company was recognized as one of the best companies in the country by the authoritative assessment of the national business rating and was recognized as the “Leader of the year 2017”. Now success, stability and high reputation of the enterprise are confirmed by prestigious awards. We have become the best in four categories: gold rating in the category “Dynamics of development”, Gold rating In the category” amount of taxes”, Gold rating in the category” industry Leader”, national certificate of the year in the field of”Finance and audit”.
  • Following the results of work for 2017 by the Organizing Committee of the Annual international award in the field of business image, reputation and trust, the Director of our company was awarded the title of ” Person of the year 2017»

2018 has become fruitful:

  • We have received the prestigious medal of the leader of international trade Import Export Award 2018 and a certificate in confirmation of the rating results.

For today «KBI Energy Group» LLP successfully completed projects as a General contractor for the following major energy enterprises:

— «Ekibastuz GRES-1 named after Bulat Nurzhanov» LLP,
— «Ekibastuz GRES-2» station JSC,
— «AlES» JSC, Almaty,
— «First wind power plant»  LLP, Astana,
— TPS-1 of «АК» JSC, Pavlodar,
— «Aktobe TPS» JSC, Aktubinsk.

For the first time during years of independence of the republic of Kazakhstan for energy units №1 (2014-2017) and №2 (2012-2015) «EGRES-1» restoration and modernization  is carried out, total capacity of 1000 MW. In 2013 unit №8 (2010-2013) «EGRES-1» was restored and commissioned, capacity of 500 МW. Upon completion of the projects realization on the «EGRES-1», until the end of 2017, the plant will reach its design capacity of  4000 МW. The company participated in the boiler installation Е-420-13,8-560-КТ (ПК100) st. №8 «AlES» JSC TPS 2, commissioning of the block and reach of the design capacity was maked In 1 quarter 2016.

Map of completed projects on territory of the Republic of Kazakhstan

«KBI Energy Group» LLP does not remain aloof from introduction of new technologies, allowing to take care of the environment and natural reserves of Kazakhstan. In the framework of this program:

— It was successfully realized and commissioned complex of wind power stations with the First wind electric station of total capacity 45 МW in region of Ermentau.
— Installation of second generation electric filters «ALSTOM Power Stavan» CJSC with high efficiency of smoking gases cleaning till 99,9% at the power units №1,2 «Ekibastuz GRES-1 named after Bulat Nurzhanov» LLP. At the power units №7,8 the electric filters of second generation  «ALSTOM Power Stavan» CJSC were commissioned in 2013. On 19.02.13 a Memorandum  between «ALSTOM Power Stavan» CJSC and «KBI Energy» LLP was signed, the aim of which is introduction of innovative energy saving and environmental technologies into power industry of both countries.
— Reconstruction and technical modernization of water treatment units for own needs at «Ekibastuz GRES-1» LLP, «Ekibastuz GRES-2 Station» JSC by the latest technology Jurby WaterTech on the basis of reverse osmosis for drinking water preparation, for receiving specially prepared demineralized water for technological processes.
— Replacement of all electrical equipment with extra high voltage and high voltage power transmission system at ОРУ-500 from «ALSTOM» CJSC (Three-winding one-phase autotransformer, voltage 500/220/35 kW, one-phase oil shunting reactor 500 kW, core gas-insulated switches 500 kW). «EGRES-1» LLP.
— Introduction of full-scope  ACS TP with high level quality and technical solutions Emerson Process Management increased control quality of main equipment, accuracy in regimes following and dynamic characteristics of power units 500 mW. «EGRES-1» LLP.
— Modernization of voltage regulation process, static excitation systems of synchronous machines with introduction of the latest development by АВВ firm on basis of excitation system UNITOL 6800 on all the blocks 500 mW. «EGRES-1» LLP.

***With participation of «KBI Energy Group» LLP held:

On «Ekibastuz EGRES-1» LLP

— Supply and installation on turnkey of turbines energy equipment 500 mW, boilers П57 with productivity 1650 tons/hour, electro-technical equipment for units 500 mW, fuel supply main equipment and its components «Ekibastuz GRES-1» LLP;
— Steel structure manufacturing for electro filters and auxiliary equipment of the boiler П57, including fuel supply equipment elements.
— Capital, current repair and modernization of main and auxiliary equipment of fuel supply
— Capital, current repair and modernization of main and auxiliary equipment of turbine
— Capital, current repair and modernization of main and auxiliary equipment boiler
— Reconstruction and technical modernization of water treatment units
— Reconstruction of ashline route, line № 3 with a length of 20 km.
— Complex examination of the equipment and power units constructions, ОРУ-500, fuel supply equipment.
— Complex commissioning works of all repairable equipment.

At «Ekibastuz GRES-2» station JSC

Reconstruction and technical modernization of water treatment units

At «AlES» JSC of Almaty

Capital and current repairs of equipment at Almaty TPS-1, TPS-2, TPS-3
Installation of boiler Е-420-13,8-560-КТ (ПК100) st. №8 «AlES» JSC TPS 2.
Extension of conveyor №4 till axis 51 with replacing the drive station
Reconstruction of dredging pump №3
Building of dredging pump №4 and reconstruction of ash and waste lines

At  «Aluminium of Kazakhstan» JSC of Pavlodar

Capital and current repairs of equipment at Pavlodar TPS-1

At «AKTOBE TPS» JSC of Aktobe

Capital repairs of turbine equipment and modernization of ОРУ
Construction of water intake for technical needs water supply «Aktobe TPS» JSC with productivity 500 m3/h from underground sources (Kuraily underground water intake)

Development, confirmation of project documentation in the Supervisory bodies. «State expertise» RSE conclusions obtaining on project documentation of all building objects and coordination with state authorities.

Our News

10 May 2023

subbotnik

Switch to mobile version