– Replacement of car dumper 2А
– Replacement of DFM 21,22,23 (crushing and milling machines)
– Restoring repair of RPM 2 (rotary loading machine)
– restoration of the architectural construction of the belt conveyor LK 25/2
– Capital repair of belt feeders 2B
– Capital and current repairs of steam boilers, working on solid fuel with capacity of 1650 t/h
– Capital and current repairs of turbines and generators with capacity 500 МW
– Modernization of flue gas cleaning units 500 МW
– Capital and current repairs of electric equipment 500 kW
– Auxiliary equipment repairs of boiler and turbine units
– Capital and current repairs of station equipment
– Capital and current repairs of buildings and structures
– Capital repair of hammer crushers SMG 97 md
– Fabrication and installation of belt conveyor trusses LK 25/2
– Engineering surveys of ash line route, ORU-500, and support of projects
– Power blocks commissioning after capital repair and regulation system modernization, and technical service after repair
– Repair and replacement of rail ways;
Back